FRITZ LANDOLT AG - Groundbreaking ceremony for the new building
On Wednesday, April 24, 2024, FRITZ LANDOLT AG, Näfels (FLN), Losinger Marazzi AG and suva celebrated the start of construction of the new FLN headquarters in Tardisland (Zizers, GR) with a ground-breaking ceremony. Together, they are developing and realising a future-proof industrial building for FLN by the end of 2025.
Since 1884, FLN has been developing, producing and distributing nonwovens and other products and has successfully positioned itself internationally as "The Swiss specialist for temporary surface protection". As the existing site in Näfels is barely able to meet the strong demand even in continuous operation, FLN decided to embark on the "Landolt 2025" generation project to shape its future sustainably. After a long search, it found the ideal location for its new headquarters with new, state-of-the-art production and logistics facilities thanks to Tardisland in the Canton of the Grisons. The site covers 15,000 m2.
TV report on the ground-breaking ceremony
(To watch the video, please activate the marketing cookies at the bottom left).